AVIC General Aviation Southern China Aircraft Industry Co., Ltd. | TPO waterproofing overall renovation of the aviation training center main & annex building roofs

Client: AVIC General Aviation Southern China Aircraft Industry Co., Ltd.
Scope: TPO waterproofing overall renovation of the aviation training center main & annex building roofs
Structure type: concrete roof + equipment bases & roof-penetrating nodes
Method: 1.5 mm TPO waterproof membrane, full-adhesion + hot-air welding
Area: main & annex building roofs | Duration: 40 days
Safety level: low-impact work for aviation operation support facilities

This project is located in Zhuhai City, Guangdong Province, systematically treating hazards such as leakage, waterproof-layer aging and node failure on the existing roof of the aircraft operations support center. It covers cleaning and renovation of the original waterproof layer, reinforcement of roof-penetrating pipes and gutters, and construction and ponding test of the new waterproof layer. Roof waterproofing accommodates low-impact work requirements, setting high standards for process organization and safety protection.

Safety Measures

  • Hot-work control: hot-air welding away from combustibles, sufficient fire equipment on site, hot-work permits with dedicated watch.
  • High-altitude protection: roof workers must wear helmets, safety ropes, anti-slip shoes; guardrails at roof edges.
  • Clean site management: materials sorted and neatly stacked, waste cleared promptly.
  • Bad-weather stop: no TPO work in rain, snow, fog or wind ≥ level 5; no work when substrate moisture exceeds limit.
  • Site enclosure & warning: safety signs, no unauthorized personnel in work area.
  • Emergency plan: emergency team led by project manager, fire/electric-shock/fall equipment.

Construction Flow

  1. Substrate repair & leveling — chisel weathered/delaminated substrate, repair with anti-crack mortar.
  2. Primer coating — evenly spray/brush special primer, dry before membrane.
  3. Membrane pre-lay & adhesive flash — unfold TPO 15–20 min, work low to high, brush adhesive.
  4. Full-adhesion laying & air exhaust — adhere membrane to substrate, roll to exhaust air, firm bond.
  5. Hot-air welding seal — automatic welder for field, manual for details, lap ≥80 mm.
  6. Detail reinforcement — additional layers at corners, pipe roots, gutters, flashing, eaves.

Main Materials & Process Parameters

Material / ProcessSpec / ModelApplication
TPO waterproof membrane1.5 mm, FS2Roof main waterproof layer full-adhesion
Special adhesiveTPO compatibleMembrane to concrete substrate bonding
PrimerTPO compatibleSubstrate surface pre-treatment
Fixing screw / battenStainless / U-battenField mechanical fixing & pipe-root reinforcement
Silicone sealantWeather-resistantFinishing, pipe roots & detail sealing
Homogeneous TPOHomogeneous typeRoof-penetrating pipe & node additional layer

On-site Gallery

Project Highlights

  • 1.5 mm TPO full-adhesion, durable system
  • Low-impact work, minimal disruption
  • Automatic + manual welding, full welds
  • Special additional layers at key nodes
  • Strict hot-work & high-altitude protection; zero accidents
  • Flat, uniform roof; waterproof meets code

Need professional building restoration services?

Whether it's roof waterproofing renovation, facade renovation or curtain-wall repair, Jixiu Building Tech provides one-stop solutions.

Consult Now
Free site survey Custom plan Professional team